Service Station
Road Safety Audit

Service Station Road Safety Audit

Project Objective

Back

As part of the on-site improvements to a petrol filling station changes were made to the sites access and egress. The improvements included the provision of a new deceleration lane and right turn lane. The local authority requested that a Stage 2 and, following on from construction of the new access, a Stage 3 audit was undertaken.


Services provided:

  • INDEPENDENT Stage 2 Road Safety Audit based upon DMRB HD19/03 and IHT guidelines
  • INDEPENDENT Stage 3 Road Safety Audit based upon DMRB HD19/03 and IHT guidelines

Project Description:

Analysis of drawings and site visits observed regular usage of road by cyclists, provision of deceleration lane and traffic splitter islands for right turn lane reduced available overtaking width for vehicles passing cyclists, recommendation and agreement to provide a shared cycleway/footway before and after the service station and other safety-related issues at both Stage 2 and Stage 3.

Client:

Coteba Limited

Location:

Shepistone Lane, Heathrow

Programme

Stage 2: Daytime Site visit at the detailed design stage, analysis of documentation, drawings and provide Safety Audit report.

Stage 3: Daytime and Night-time site visit after completion of majority of works, analysis of documentation, drawings and provide Safety Audit report.